Description
Golen LEG-250K/500K-TT-B Commercial Power Conversion System (PCS)
250kW / 500kW Commercial & Industrial Energy Storage PCS
The Golen LEG-250K/500K-TT-B is a high-power Power Conversion System (PCS) designed for commercial and industrial Battery Energy Storage System (BESS) applications.
Available in 250kW and 500kW configurations, the LEG-250K/500K-TT-B provides bidirectional power conversion between the battery storage system and the AC electrical network.
It is designed for large-scale applications including peak shaving, load shifting, solar + BESS integration, backup power, microgrids and commercial energy management.
For businesses with substantial electricity demand, the Golen PCS can serve as a core component of an engineered energy-storage system.
Key Features
- 250kW / 500kW power configurations
- Commercial & industrial BESS application
- Bidirectional battery power conversion
- High-power AC/DC conversion
- Designed for high-capacity battery systems
- Suitable for solar + BESS integration
- Peak shaving and load-shifting applications
- Backup and energy-resilience applications
- Suitable for microgrid projects
- Compatible with commercial energy-management architectures
- Suitable for large commercial and industrial energy-storage projects
Available Power Ratings
| Model Configuration | Rated Power |
|---|---|
| LEG-250K-TT-B | 250 kW |
| LEG-500K-TT-B | 500 kW |
Confirm the exact model designation, electrical ratings and available configurations against the latest Golen technical documentation before procurement.
What Is a PCS?
A Power Conversion System (PCS) is a key component of a Battery Energy Storage System.
It controls the flow of electrical energy between the battery and the AC electrical network.
During charging:
AC Grid / Solar → PCS → Battery
During discharge:
Battery → PCS → AC Loads / Grid
This bidirectional conversion allows the BESS to participate in applications such as peak shaving, load shifting, backup power and renewable-energy integration.
Commercial & Industrial Applications
The Golen LEG-250K/500K-TT-B is suitable for:
- Manufacturing plants
- Industrial facilities
- Large factories
- Hotels and resorts
- Hospitals
- Flower farms
- Commercial buildings
- Shopping centres
- Warehouses
- Cold-storage facilities
- Large agricultural operations
- Data and technology facilities
- Commercial microgrids
Energy Storage Applications
Peak Shaving
Discharge stored battery energy during periods of high demand to help reduce peak electrical demand and optimize energy costs.
Load Shifting
Store energy when appropriate and discharge it during periods of higher demand or when grid electricity is less economically attractive.
Solar + BESS
Integrate large-scale solar PV with battery storage to increase solar self-consumption and improve energy availability.
Backup Power
The PCS can form part of a properly engineered backup-power system supporting critical loads during grid interruptions.
Generator Hybridization
Combine battery storage with diesel generation and solar PV to improve generator utilization and energy management.
Microgrids
The PCS can be incorporated into commercial and industrial microgrid architectures combining multiple energy sources and controllable loads.
Typical System Architecture
A typical large-scale C&I system may include:
Solar PV → PV Inverter → AC Bus
HV Battery → Golen PCS → AC Bus → Commercial / Industrial Loads
with:
Grid + Generator + EMS + Protection + Monitoring
The final architecture depends on the site’s load profile, battery configuration, grid connection, operating strategy and applicable electrical standards.
Why Choose a 250kW / 500kW PCS?
Large commercial and industrial facilities can have significant instantaneous power requirements.
A high-power PCS provides a scalable interface between large battery banks and the facility’s electrical network.
The Golen LEG-250K/500K-TT-B can therefore serve as a building block for BESS projects ranging from large commercial installations to industrial energy-storage systems.
For larger projects, multiple PCS units may be considered where the manufacturer’s approved system architecture supports parallel operation.
Powerstack C&I BESS Integration
Powerstack Africa Energy can integrate the Golen PCS into a complete commercial or industrial energy-storage solution.
A typical project can include:
Energy Audit
Analyse electricity consumption, operating hours and demand profile.
Load Analysis
Identify peak demand, critical loads and energy-storage requirements.
BESS Sizing
Determine the appropriate battery capacity and PCS power rating.
System Design
Develop the electrical architecture, protection, controls and energy-management strategy.
Equipment Supply
Supply the PCS, batteries, EMS, protection equipment and associated system components.
Installation & Commissioning
Complete installation, testing, configuration and commissioning.
Monitoring & Maintenance
Provide ongoing technical support and system performance monitoring.
Suitable Battery Configurations
The Golen LEG-250K/500K-TT-B should be paired with an appropriately matched high-voltage battery system.
Depending on the project, Powerstack can engineer configurations using:
- 100kWh+ commercial BESS
- 200kWh+ BESS
- 500kWh BESS
- 1MWh BESS
- Multi-MWh containerized BESS
Battery voltage, current, BMS communication and PCS compatibility must be confirmed during system design.
Technical Specifications
| Specification | Details |
|---|---|
| Product | Golen LEG-250K/500K-TT-B |
| Product Type | Power Conversion System (PCS) |
| Power Rating | 250kW / 500kW |
| Application | Commercial & Industrial BESS |
| Conversion | Bidirectional |
| Battery System | High-voltage BESS |
| Applications | Peak Shaving, Load Shifting, Backup, Solar + BESS |
| Integration | Battery / Grid / Solar / EMS |
| Installation | According to manufacturer requirements |
Final technical specifications such as DC voltage range, maximum DC current, AC voltage, AC frequency, efficiency, overload capability, IP rating, cooling system, communication interfaces, dimensions and operating temperature should be confirmed from the latest manufacturer datasheet.
Powerstack Africa Energy — C&I Energy Storage
Powerstack Africa Energy specializes in commercial and industrial solar PV, battery energy storage and energy infrastructure solutions.
The Golen LEG-250K/500K-TT-B can be deployed as part of a complete system designed around your facility’s actual energy requirements.
From Energy Audit to EPC
Energy Audit → Load Analysis → BESS Sizing → PCS Selection → System Design → Procurement → Installation → Commissioning → Monitoring
Request a Commercial BESS Proposal
Planning a 250kW or 500kW BESS project in Kenya or East Africa?
Contact Powerstack Africa Energy for:
✓ PCS Pricing
✓ Technical Datasheet
✓ Battery Compatibility Assessment
✓ BESS Sizing
✓ Solar + BESS Design
✓ Site Assessment
✓ ROI & Energy-Savings Analysis
✓ EPC Proposal
Talk to a Powerstack Energy Engineer
Send your latest electricity bill and basic load information to begin a preliminary assessment.
Frequently Asked Questions
What is the Golen LEG-250K/500K-TT-B?
It is a high-power commercial and industrial Power Conversion System (PCS) designed for bidirectional energy conversion in large battery energy-storage systems.
What power ratings are available?
The product family is available in 250kW and 500kW configurations, subject to the manufacturer’s current product range.
What is a PCS used for?
A PCS manages the bidirectional flow of energy between a battery system and an AC electrical network. It is a core component of a commercial or industrial BESS.
Can it be used with solar?
Yes. A PCS can form part of a solar + BESS system, allowing solar generation and stored battery energy to be coordinated with the facility’s electrical demand.
Can it be used for peak shaving?
Yes. A properly designed BESS using the PCS can discharge battery energy during periods of high demand to support peak-demand management.
Can it be used for a 1MWh BESS?
Potentially, depending on the battery voltage, PCS configuration and manufacturer’s approved system architecture. Powerstack can engineer the appropriate battery-to-PCS configuration for the project.
Is it suitable for industrial applications?
Yes. The 250kW and 500kW power classes are particularly relevant to large commercial and industrial energy-storage projects.







Reviews
There are no reviews yet.